
Sterner AquaTech UK's Project and Design team provides clients with a wealth of experience, knowledge and capability to provide a single, turnkey solution to any problem. With projects varying from the installation of a single filter, through to complex arrangements of multiple integrated streams and systems, we have a depth of knowledge that allows us to bring value to any project.
Projects and Turnkey solutions
Our project team have a vast wealth of experience when it comes to providing turnkey solutions, and in recent years have carried out projects ranging in size from £100,000 to £1million. Faced with a question or problem, however large or small, our design team can select the correct equipment which will work together to provide the solution. Providing the Client with drawings and specifications, as well as 3d imagery, allows the Client to understand fully the proposal, and have the peace of mind their project is on the right track.
In many instances, after procurement of the equipment, there is a stage of prefabrication within our Inverness facility where equipment will be tested, or perhaps installed into containers ready for transportation to site. We aim to carry out as much work within our own facility so that when equipment arrives on site, it is as close to plug and play as possible.
The installation of our equipment is carried out by our operatives and technicians, many of who are multi skilled in electrical and pipework, and consequently our installation teams are 2 or 3 man teams who have the skill set to attack any problem they may come across.